Structures

The provision of new and the repair/refurbishment of existing structures has been a key source of repeat business for many years. Dealing safely with stringent programme constraints whilst working on live carriageways is an area in which we have built up considerable experience.

Much of this work is on highway bridges but also included are flood defences, retaining walls, industrial plants and structures in ports and maintenance depots.

Widening and Strengthening

  • Value of development £668K
  • Development time 26 weeks
  • Contract type NEC 3 Option B
  • Concise planning Live working environment
Case Study

Knights Bridge

Newbury, Berkshire

Knights Bridge

Newbury, Berkshire

Bridge replacement scheme

  • Value of development £750K
  • Development time 22 weeks
  • Project type Framework
  • Significant traffic management
Case Study

Knights Little Bridge

Newbury, Berkshire

Knights Little Bridge

Newbury, Berkshire

Junction widening scheme

  • Value of development £2.3M
  • Development time 28 weeks
  • Contract type NEC 3 Contact
  • Project type Framework
Case Study

M27 Junction Improvement

Whiteley, Hampshire

M27 Junction Improvement

Whiteley, Hampshire

Flood Defence Improvement Works

  • Value of development £668K
  • Development time 14 weeks
  • Project type Framework
  • Works included significant temporary works
Case Study

Winchester Flood Defences

Winchester, Hampshire

Winchester Flood Defences

Winchester, Hampshire

Railway Bridge Safety Barrier

  • Value of development £249K
  • Development time 9 weeks
  • Project type Framework
  • Concise planning Live working environment
Case Study

Crabbe Lane Bridge

Sway, Hampshire

Crabbe Lane Bridge

Sway, Hampshire

Improvement Works

  • Value of development £500K
  • Development time 13 weeks
  • Project type Framework
  • Works included Significant temporary works
Case Study

Brunel Bridge

Maidenhead, Hampshire

Brunel Bridge

Maidenhead, Hampshire

Road Stabilisation Scheme

  • Value of development £3.7M
  • Development time 18 weeks
  • Project type Framework
  • Opened on time No reportable accidents
Case Study

A349 Gravel Hill

Wimborne, Dorset

A349 Gravel Hill

Wimborne, Dorset