Brunel Bridge

Improvement Works

This project involved the structural reinforcement of an existing bridge, through installing a new parapet cast on to the existing bridge beam, with the reinstatement of two pedestrian stringcourses, replacement of hand rails and finally, complete resurfacing works.

The project required significant attention to Health and Safety, due to the height, and heavy flow of traffic both on and below the bridge. This project further adds to our portfolio of bridge refurbishment and resurfacing works, again this project was delivered both on time and within budget.

Development time

13 weeks

Project type

Framework

Works included

Significant temporary works

DSCF1144

Brunel Bridge

Maidenhead Railway Bridge, Maidenhead, UK