Brunel Bridge
Improvement Works
This project involved the structural reinforcement of an existing bridge, through installing a new parapet cast on to the existing bridge beam, with the reinstatement of two pedestrian stringcourses, replacement of hand rails and finally, complete resurfacing works.
The project required significant attention to Health and Safety, due to the height, and heavy flow of traffic both on and below the bridge. This project further adds to our portfolio of bridge refurbishment and resurfacing works, again this project was delivered both on time and within budget.
Development time
13 weeks
Project type
Framework
Works included
Significant temporary works
Brunel Bridge
Maidenhead Railway Bridge, Maidenhead, UK