This was the fourth scheme on which we have worked with Mildren Construction, their team provide a consistent quality of service and product. I would have no hesitation in working with them again in the future or indeed recommending them to others.

Mark Craft, Head of Construction, Travis Perkins

Deheers was a complicated project in a listed building, completed during the COVID pandemic. Mildren were very flexible, helpful and delivered a good final product. This project was a challenge but Mildren were up to it.

Mickey Jones, DJ Property
Deheers, Weymouth

Mildren came to this project late in the day and worked with our team to agree a contract quickly and hit the ground running quickly thereafter. The Mildren team were knowledgeable and friendly – overall a good contractor to deal with. The project and site had its challenges which Mildren deal with well.

Paul Williams, Project Manager, Total Project Integration
Ridgewood Farm, Uckfield

Mildren worked very hard and diligently throughout a Pandemic and testament to a well run business. Kier will be using Mildren again wherever possible to continue a good working relationship.

Darren Kennett, Kier Properties
Fulcrum 6, Whiteley

A well planned and executed project supported by a very professional team which responded quickly to our changing needs throughout.

Darren Davies, RKE Biogroup
Basingstoke

Mildrens should be complimented on their attitude towards their directly-employed Staff and their sub-contractors, many of whom have worked together for years, which showed in the quality of workmanship and the atmosphere that prevailed on site. I look forward to working with the team again at some point in the future

Eddie Dalton Architecture & Design Services, Hampshire County Council

I would like to thank all the team for their attention to the Hanger 62b at Bournemouth Airport and I look forward to undertaking more business with Mildren Construction in the future.

James Clay Director, Industrial, Office and Retail Agency, London Clancy

I just wanted to write and say ‘Thank You’ and ‘Well done’ to ALL those involved in the road improvements around Fareham train station and Redlands Lane as well as the landscaping. Such a difference both for the road user and the pedestrian as well as the new steps to the train station.

Mrs S Pavard
Resident in Fareham

I have known and worked with Chris Wingham and his team for many years. Their knowledge and in-depth understanding of our project requirements, always ensures we receive an exemplary level of service.

Barry Crook G Crook & Sons Ltd

Every consideration was show by Mildren Construction Ltd - a friendly work team always courteous. Many people have remarked how good the brick wall looks at Crabbswood Lane Bridge.

Ms Farr Resident
Lymington

We have all been so hugely impressed by the Mildren Team throughout their time in Hambledon. All the team have been exceptionally helpful, courteous and polite

Mrs Barley
Resident in Hambledon

Just to say really well done, to all concerned, on the completion of this project. We are local residents and were not looking forward to this scheme, especially after the bad experience of the works nearby on the A331 last year. But it has been near perfect. The contractor has worked very professionally and considerately - and we have noticed very little inconvenience. In fact the temporary signals worked better than the previous permanent ones - and the new right turn looks like it will be of great overall benefit too.

David Searle
Resident in Surrey

We are writing to say thank you to the Mildren ‘Gang’ carrying out the massive alterations to Hungerhill Poole. They are very hard workers, friendly and have done a very good job handling so many problems with drivers that arised during the works.

Mr and Mrs R Wealands

We just wanted to let you know how brilliant your team has been during the new sewer pipe connection at Millhams Recycling Centre. Throughout this project they have been friendly, considerate and have always kept us informed as to what has been going on.

Residents near Millhams Road, Kinson

This is to say thank you so much for helping me out with the fence. You made an old lady very happy.

Mrs Gill
Chichester

We have used Mildren on at least three projects and they have always delivered a quality job and been prepared to listen to our professional team and work with them.

Chris Barraclough, Salisbury Racecourse
Salisbury

Mildren as a contractor set their standards at the highest level and manage to exceed the clients expectations on delivery and budget at each stage of the project. The quality of the work and materials used is always of the highest standard.

James Stott, BAE
Circular Road, Portsmouth Naval Base

This project had a number of challenges and the commitment to keep going despite these issues and deliver, is very much to the Mildren Teams credit, not least finding a way to work continuously through the Covid19 lockdown period of 2020.

Paul Sharman, Sharman Projects
Aldi, Weymouth

Pro-active Construction Company. Discusses issues and problems as they arise and always looks to resolve issues as they arise to minimise impact.

James Rosier, Philip Pank
Forgewood, Crawley

A good contractor with a very positive can do attitude.

Kevin Bunday, Eastleigh BC
Horton Heath Infrastructure project

Good collaboration. Good comms. Performance and quality above average.

Andy Mabey
Hampshire County Council

A very professional service with a high standard of expertise and good quality end product.

Gary Johnson
Eco SS, Parley

The site team worked well with the client, Mildren site foreman Alan and the two permanent site workers ran the site well ensuring it was tidy and working in a controlled manner. The Qs worked with the client to address the variations in a pragmatic way that worked well throughout the project considering the complexity the environment presented. A truly good project well managed by Mildren.

Jonathan Brace
Wightlink, Portsmouth