Brickwork progress at Arun Crematorium

August 22nd, 2022 Posted in Civil Engineering, News
Drone 2 22.8.2022

Brickwork is progressing well at Arun Crematorium.

Thanks to Dan Ward at D&D Brickwork for the drone shots and Mildren’s Design Coordinator Rowland Griffin for the ground shots….

Drone 22.8.2022 Resized brickwork 2 Resized brickwork 1