Waterside Infrastructure Project

This project involved an extensive redevelopment of the waterfront on the Gosport side of Portsmouth Harbour and included a variety of maritime activities to create a new marina and associated facilities. 

A breakwater was constructed to one side of the marina by installing rock armour revetments into the seaward channel and reclaiming the land behind. 

The marina was further enclosed by a refurbished 250m long jetty on which we replaced the hardwood timber fenders and decking. Floating pontoons secured with driven tubular piles provided berthing facilities and the project also included a number of reinforced concrete structures constructed in tidal conditions. 

  • 37 weeks
    Duration
  • 250m long jetty
    Refurbishment
  • Parking and soft landscaping
    Works included