Cricket St. Thomas Hotel

Hotel Extension

The project comprised the construction of a 24 bedroom extension to the existing hotel. It incorporated some refurbishment to the end of the existing block, onto which the new wing was attached, plus the re-routing of the original fire escape, before the extension works could begin.

The building design incorporated a timber frame construction with external rendered blockwork and feature brick quoins and reveals to both doors and windows all designed to match the existing building. Internally a pre-cast block and beam screeded floor was constructed and covered finishes to match existing. Also included in the design was all the associated external landscaping, drainage, mechanical and electrical works.

Value of development

£2.5M

Development time

24 weeks

Project type

New build and refurbishment

Works included

Significant external works

DSCF1048

Cricket St. Thomas Hotel