ABP Berth 109, Southampton

RC loading platform.

Working inside a busy port, several thousand tonnes of contaminated soil was removed from the site, prior to the construction, adjacent to a live rail line, of this RC loading platform of approximately 6,500m2. 

The works also included new high mast lighting, service diversions, stormwater drainage, a data cable distribution system, perimeter security fencing and gates. Two navigation masts that are used by ships in the Solent were repositioned. 

The work was carried out in phases to allow the occupier to continue their container handling business uninterrupted. In addition, their offices were repositioned and the entrance to the facility was remodelled.

Value of development

£2.44m

Development time

25 weeks

Project size

6500m2